Eaton’s Crouse-Hinds series ALTR-X4 offers a cost-effective and reliable solution for hazardous area applications where obstruction lights are difficult and expensive to service. Ideal for towers, stacks, and other installations with inaccessible lights, the ALTR-X4 ensures optimal performance with minimal maintenance.

Key Benefits of ALTR-X4:

  • Hazardous Area Certification: Utilizes a Class I, Division 2 enclosure, making it suitable for hazardous environments.
  • Alternating Light Control: The ALTR-X4 alternates between lights in a double obstruction light assembly each time the tower lights are activated by the photocontrol. This feature ensures balanced usage of both lights over their lifespan.
  • Automatic Fail-Safe Mechanism: In the event of a light failure, the ALTR-X4 automatically switches to the operational light and provides an output for remote alarm monitoring.
  • Extended Lifespan: The ALTR-X4 maximizes the lifespan of both lights, effectively doubling the interval between service calls.

Enhance the efficiency and reliability of your hazardous area obstruction lighting systems with Eaton’s Crouse-Hinds series ALTR-X4. It’s the economical choice for maintaining operational lights and reducing service intervals.

Description

Certifications and compliances

  • Class I, Division 2, Groups B, C, D
  • NEMA 4

Design features

  • Alternating feature doubles lamp life
  • Custom drill and tap available upon request
  • Designed for outdoor mounting
  • Can be installed at the base of the LED light fixture or at ground level at the base of the structure
  • NPT conduit entries located on the top and bottom of enclosure
  • AC input: 120 VAC or 230 VAC, 50/60 Hz

Ordering information

Catalog number Product description
70026-RTO-X4 120 VAC, transfer relay assembly for L-810 dual fixtures –Primary light and backup light roles set permanantly
70226-RTO-X4 120 VAC, transfer relay assembly for L-810 dual fixtures –Primary light and backup light roles set permanantly
70029-RTO-X4 120 VAC, alternating transfer relay assembly for dual fixtures – Primary light and backup light switch roles at each photocelltransition (typically 12 hours)
70229-RTO-X4 240 VAC, alternating transfer relay assembly for dual fixtures –Primary light and backup light switch roles at each photocelltransition (typically 12 hours)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare